August 9 – Garage Extension Update


Oh My!   Workmen are crawling everywhere around here today, like honey bees to a hive. 

Four different crews to be exact.      

  

 

We have two guys installing new eves and downspout all around the new garage. 

 This is cool because I have two new rain barrels all ready to be installed at the back of the garage, close to my garden. 

 We have a guy and his ditch witch machine digging a long trench.

  The trench will go from the far side of the house,  across  the back and over to the new garage.   

Electrical cable will be buried there.     (I hope my beautiful trees  survive this intrusion)

 

 

 

 

 

 

An electrician is here today setting up the 100 amp breaker for the garage.   Plus….  Warren and Jordon continue to hang siding. 

Us girls are staying inside,  out-of-the-way.

About westlakemusings

In 2013 my husband and I retired. We bought an old pre-confederation house out in the country. This blog is about our new world in the country as we explore all of life's possibilities.
This entry was posted in Renovations and tagged , , , , , , , . Bookmark the permalink.

5 Responses to August 9 – Garage Extension Update

  1. lot going on at your place! go into town for lunch

  2. Rev. Marilyn says:

    The siding looks amazing. So much work going on. No wonder “you girls” are staying inside out of the way.

  3. Is that an Irish wolfhound? She’s beautiful.

I would love to hear your thoughts. I really, really love comments.

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s